HEI was selected by Crown Castle Venues as the General Contractor to provide turnkey, ground up construction of the UNM Distributed Antenna System HUB which will serve as the network data center for the DAS system installed at the UNM PIT and Football Stadium.  The facility consists of a 1,500 square foot building of CMU block and steel construction, 800 amp electrical distribution system, five roof mounted HVAC units, clean agent fire suppression system, hydrogen gas detection and exhaust system, external sub grade halo grounding system, internal halo grounding system, EPDM roofing and exterior insulated EIFS finish.  In addition to overall construction responsibilities, HEI provided supplemental design support to the Engineer of record thus delivering a streamlined operational facility to the owner.  HEI was also requested to support the build out of the DAS fiber optic backbone system.  The FOC scope of work included the installation of outside plant cable and over 540 terminations including subterranean fusion and angled polished pigtail fusion splicing.  Owner provided fiber and Leviton terminations. HEI was proud to deliver this project within the specified timeframe and budgetary expectations.

    Request A Quote

    We are prepared to exceed your expectations at a competitive rate.

    ×