This project was in two phases 1st was to establish 2nd floor telecom room and install over 400 category 6 lines between the two floors.  Phase 2 was the “Old” side of the building which involved a tremendous coordination in the new MDF to move existing copper, fiber and network equipment to new rack layouts and new wall-field all the while maintaining services throughout the building.  HEI electrical division installed new electrical outlets to the new rack layout as well and moving the existing UPS to Calvin Hall and providing power at its new location.  BerkTek/Ortronic was the solution and over 440 category 6 lines were installed on the final phase.